In the traditional way, it is necessary to take grease samples from the wind turbine, and then send the samples to the laboratory, the customer often needs to wait for 1-2 weeks, during which time either the turbine is shut down resulting in a loss of power generation or the bearings are running sick, causing irreversible damage, which is a situation the customer does not want to see.